Sparks Boulevard Project
Public Hearing

Click the link below to view the  Environmental Assessment (EA) Materials

View Environmental Assessment 

Project Documents

View and download official project documents, as they become available.

Corridor Study

The Sparks Boulevard Multi-Modal Corridor Study was developed in 2015.

Download

Environmental Assessment (EA)

The Environmental Assessment (EA) was approved in 2023.

Download

Project Fact Sheet

Click the link below to download the Sparks Boulevard Project Fact Sheet.

Download

Preferred Alternative

The RTC, in cooperation with the Nevada Department of Transportation (NDOT) and City of Sparks, have identified a preferred alternative for the corridor. The (2015) Corridor Study helped develop recommended improvements based on purpose, needs, and priorities. The recommended improvements were then refined into the preferred alternative based on input from the public, understanding planned improvements adjacent to the corridor, land-use development, and traffic volume forecasts based on growth in our community. The recommended improvements were further evaluated on their benefit or impact to several criteria including safety, bicycle/pedestrian access, right-of-way, wetlands, drainage, recreational/historical features, traffic operations and cost. The findings from this evaluation are incorporated into the development of the EA for Phase 2 of the project.

Phase 1 
Greg Street to I-80 WB Ramps

Phase 1
I-80 Overpass

Phase 2
I-80 WB Ramps to Lincoln Way

Phase 2
Lincoln Way to Prater Way

Phase 2
Prater Way Intersection

Phase 2
Prater Way to O’Callaghan Intersection 

Phase 2
Springland/O'Callaghan Intersection

Phase 2
O'Callaghan Intersection to Baring Blvd

Phase 2
Baring Blvd Intersection

Learn more about how Sparks Boulevard improvements are being constructed in two phases and view an updated schedule.